Product Selector

Filters
Product Type
Thermal Conductivity
Product Certifications Applications Viscosity Cure Schedule Hardness Temp. Range Link to Content
Supreme 10HTN One Part Epoxy
Supreme 10HTN-NV
One component, heat curing, nickel conductive epoxy system
Tensile Lap Shear Strength
1,200-1,400 psi
Volume Resistivity
5-10 ohm-cm
  • RoHS Compliant
  • Bonding
  • Sealing
  • Coating
  • Gap Filling
paste minimum 250°F for 60-90 minutes 85-95 Shore D 4K to 400°F /fr/tds/supreme-10htn-nv
Supreme 10HTND-3 One Part Epoxy
Supreme 10HTND-3
One component, toughened epoxy system
Tensile Strength
8,000-9,000 psi
Tensile Modulus
450,000-500,000 psi
  • RoHS Compliant
  • Bonding
  • Sealing
  • Coating
  • Gap Filling
paste 60-75 minutes at 250°F 75-85 Shore D 4K to +400°F /fr/tds/supreme-10htnd-3
Supreme 10HTS One Part Epoxy
Supreme 10HTS
One component, heat curing, toughened epoxy system
Tensile Lap Shear Strength
>1,200 psi
Volume Resistivity
<0.006 ohm-cm
  • NASA Low Outgassing
  • RoHS Compliant
  • Bonding
  • Sealing
  • Coating
  • Gap Filling
>500,000 cps 250°F for 60-75 minutes, 300°F for 40-45 minutes >75 Shore D 4K to +400°F /fr/tds/supreme-10hts
Supreme 112: two part epoxy for bonding, sealing, potting and impregnation
Supreme 112
Two part epoxy for bonding, sealing, potting and impregnation requires elevated temperature curing
Glass Transition Temperature (Tg)
190-195°C
Volume Resistivity
>10¹⁴ ohm-cm at 25°C, >10¹² ohm-cm at 150°C
  • NASA Low Outgassing
  • RoHS Compliant
  • Bonding
  • Sealing
  • Impregnation
  • Coating
  • Encapsulation
  • Gap Filling
50-200 cps 1-2 hours at 200-210°F followed by 3-4 hours at 250°F and then 4-6 hours at 300°F 75-90 Shore D -80°F to +550°F /fr/tds/supreme-112
Supreme 11AOHT Two Part Epoxy
Supreme 11AOHT
Two component thermally conductive, electrically insulative epoxy compound for bonding, coating and sealing
Dielectric Constant
4.6
Tensile Lap Shear Strength
3,200-3,400 psi
  • MIL-STD-883J for Thermal Stability
  • RoHS Compliant
  • Bonding
  • Coating
  • Sealing
  • Gap Filling
Part A: 200,000-300,000 cps, Part B: paste 8-12 hours at 75°F, plus 1-2 hours at 150-200°F 80-85 Shore D -112°F to +400°F /fr/tds/supreme-11aoht
Supreme 11AOHT-LO Two Part Epoxy System
Supreme 11AOHT-LO
Toughened, high strength, two component epoxy for bonding and sealing
Coefficient of Thermal Expansion
35-40 X 10⁻⁶ in/in/°C
Tensile Lap Shear Strength
3,200-3,400 psi
  • 1,000 Hours at 85°C/85% RH
  • RoHS Compliant
  • NASA Low Outgassing
  • Bonding
  • Sealing
  • Coating
Part A: 200,000-300,000 cps, Part B: paste overnight at 75°F followed by a few hours at 150-200°F 80-90 Shore D -112°F to +400°F /fr/tds/supreme-11aoht-lo
Supreme 11AOHTLP Two Part Epoxy
Supreme 11AOHTLP
Two component, thermally conductive, electrically insulative epoxy for bonding, sealing and coating
Dielectric Constant
4.6
Tensile Modulus
400,000-450,000 psi
  • NASA Low Outgassing
  • RoHS Compliant
  • Bonding
  • Sealing
  • Coating
  • Gap Filling
paste overnight at 75°F followed by 3-4 hours at 150-200°F 85-90 Shore D -112°F to +400°F /fr/tds/supreme-11aohtlp
Master Bond Supreme 11AOHTMed Epoxy System
Supreme 11AOHTMed
Toughened, high strength, two component epoxy for bonding and sealing
Dielectric Constant
4.6
T-peel Strength
15-20 pli
  • ISO 10993-5 for Cytotoxicity
  • RoHS Compliant
  • Bonding
  • Sealing
  • Coating
  • Gap Filling
Part A: 200,000-300,000 cps, Part B: paste 75°F: 24-36 hours; 200°F: 1-2 hours 80-90 Shore D -112°F to +400°F /fr/tds/supreme-11aohtmed
Supreme 11HT Two Part Epoxy
Supreme 11HT
Toughened, two component epoxy for bonding, sealing and coating
Coefficient of Thermal Expansion
45-50 X 10⁻⁶ in/in/°C
Tensile Lap Shear Strength
3,200-3,400 psi
  • RoHS Compliant
  • Bonding
  • Sealing
  • Coating
  • Gap Filling
Part A: 90,000-120,000 cps, Part B: 60,000-110,000 cps overnight at 75°F, followed by 1 hour at 150-200°F 75-85 Shore D -112°F to +400°F /fr/tds/supreme-11ht
Two Part Epoxy Supreme 121AO
Supreme 121AO
Two part toughened epoxy for bonding, sealing and encapsulation features good thermal conductivity
Glass Transition Temperature (Tg)
200-210°C
Thermal Conductivity
4-5 BTU•in/(ft²•hr•°F)
  • NASA Low Outgassing
  • RoHS Compliant
  • Bonding
  • Sealing
  • Encapsulation
  • Potting
  • Coating
  • Gap Filling
10,000-25,000 cps 1-2 hours at 200-210°F followed by 3-4 hours at 250°F and then 4-6 hours at 300°F. Additional post curing at 350°F for 2-4 hours will further enhance product properties. 85-95 Shore D -80°F to +550°F /fr/tds/supreme-121ao

Need Expert Guidance?

Our expert engineers offer one-on-one consultations to help you navigate our extensive material library and find the right solution for your application. We ensure confidentiality and quick turnaround (1-2 business days).