Product Selector

Filters
Product Type
Thermal Conductivity
Product Certifications Applications Viscosity Cure Schedule Hardness Temp. Range Link to Content
Two Part Epoxy Supreme 121AOMed
Supreme 121AOMed
Two part toughened epoxy for bonding, sealing and potting featuring good thermal conductivity and high temperature resistance; requires oven curing
Glass Transition Temperature (Tg)
200-210°C
Thermal Conductivity
4-5 BTU•in/(ft²•hr•°F) [0.58-0.72 W/(m•K)]
  • ISO 10993-5 for Cytotoxicity
  • RoHS Compliant
  • Bonding
  • Sealing
  • Encapsulation
  • Potting
  • Coating
  • Gap Filling
10,000-25,000 cps 1-2 hours at 200-210°F followed by 3-4 hours at 250°F and then 4-6 hours at 300°F. Additional post curing at 350°F for 2-4 hours will further enhance product properties. 85-95 Shore D -80°F to +550°F /it/tds/supreme-121aomed
Supreme 121AOND Two Part Epoxy
Supreme 121AOND
Two part toughened epoxy for bonding, sealing and encapsulation features good thermal conductivity
Glass Transition Temperature (Tg)
200-210°C
Thermal Conductivity
4-5 BTU•in/(ft²•hr•°F)
  • NASA Low Outgassing
  • RoHS Compliant
  • Bonding
  • Sealing
  • Coating
  • Gap Filling
paste 1-2 hours at 200-210°F followed by 3-4 hours at 250°F and then 4-6 hours at 300°F. Additional post curing at 350°F for 2-4 hours will enhance properties. 85-95 Shore D -80°F to +550°F /it/tds/supreme-121aond
Supreme 12AOHT-LO One Part Epoxy System
Supreme 12AOHT-LO
One part, thermally conductive, electrically insulating, high performance epoxy for bonding and sealing; meets NASA low outgassing specifications
Glass Transition Temperature (Tg)
135-140°C
Tensile Lap Shear Strength
3,400-3,600 psi
  • 1,000 Hours at 85°C/85% RH
  • MIL-STD-883J for Thermal Stability
  • NASA Low Outgassing
  • RoHS Compliant
  • Bonding
  • Sealing
  • Coating
  • Gap Filling
paste 125°C (257°F) in 60-70 minutes and 150°C (302°F) in 40-50 minutes 80-90 Shore D 4K to +500°F /it/tds/supreme-12aoht-lo
One Part Epoxy System
Supreme 17HT
One component toughened epoxy system for bonding and sealing
Glass Transition Temperature (Tg)
208-210°C
Tensile Lap Shear Strength
1,900-2,100 psi
  • NASA Low Outgassing
  • RoHS Compliant
  • Bonding
  • Sealing
  • Coating
  • Gap Filling
100,000-150,000 cps 300°F for 4-6 hours, plus 8-12 hours at 350°F. 80-90 Shore D -100°F to +550°F /it/tds/supreme-17ht
Supreme 17HTMed One Part Epoxy
Supreme 17HTMed
One component, medical grade toughened epoxy system for bonding and sealing
Glass Transition Temperature (Tg)
208-210°C
Tensile Lap Shear Strength
1,900-2,100 psi
  • RoHS Compliant
  • ISO 10993-5 for Cytotoxicity
  • Bonding
  • Sealing
  • Coating
  • Gap Filling
100,000-150,000 cps 4-6 hours at 300°F or 2-4 hours at 350°F 80-90 Shore D -100°F to +550°F /it/tds/supreme-17htmed
Supreme 17HTND-2 One Component Epoxy
Supreme 17HTND-2
One component toughened epoxy system for bonding and sealing
Glass Transition Temperature (Tg)
208-210°C
Tensile Lap Shear Strength
1,900-2,100 psi at 75°F
  • NASA Low Outgassing
  • RoHS Compliant
  • Bonding
  • Sealing
  • Gap Filling
  • Coating
paste 300°F for 4-6 hours or 350°F for 2-4 hours; recommended cure schedule is 4-6 hours at 300°F followed by a post cure of 8-12 hours at 350°F 80-90 Shore D -100°F to +550°F /it/tds/supreme-17htnd-2
Supreme 33CLV Two Part Epoxy
Supreme 33CLV
Toughened, two component epoxy for bonding, sealing and coating
Tensile Lap Shear Strength
2,200-2,400 psi
Tensile Modulus
300,000-350,000 psi
  • RoHS Compliant
  • Bonding
  • Sealing
  • Coating
  • Gap Filling
  • Encapsulation
Part A: 40,000-70,000 cps, Part B: 2,500-5,000 cps 75°F: 48-72 hours; 200°F: 2-3 hours 75-80 Shore D -100°F to +425°F /it/tds/supreme-33clv
Supreme 33ND Two Part Epoxy System
Supreme 33ND
Two component, toughened epoxy for bonding and sealing with high temperature resistance
Coefficient of Thermal Expansion
35-40 x 10⁻⁶ in/in/°C
Glass Transition Temperature (Tg)
115-120°C
  • NASA Low Outgassing
  • RoHS Compliant
  • 1,000 Hours at 85°C/85% RH
  • Bonding
  • Sealing
  • Coating
  • Gap Filling
Part A: paste, Part B: paste 75°F: 48-72 hours; 200°F: 2-3 hours 75-85 Shore D 4K to +425°F /it/tds/supreme-33nd
Supreme 34CA Two Component Epoxy
Supreme 34CA
Two component epoxy system for bonding, sealing and coating applications
Tensile Lap Shear Strength
>2,500 psi
Volume Resistivity
>10¹⁴ ohm-cm
  • RoHS Compliant
  • Bonding
  • Sealing
  • Coating
  • Gap Filling
7,000-20,000 cps gel for 1 hour at 110°C followed by 2-3 hours at 125-150°C >75 Shore D -80°F to +500°F /tds/supreme-34ca
Supreme 3CCM-85 One Component Epoxy Compound
Supreme 3CCM-85
One component, toughened epoxy system for bonding, sealing, coating and encapsulating
Tensile Strength
2,000-3,000 psi
Volume Resistivity
>10¹⁴ ohm-cm
  • RoHS Compliant
  • NASA Low Outgassing
  • Bonding
  • Sealing
  • Coating
  • Encapsulation
  • Gap Filling
35,000-95,000 cps Cures at 175-185°F for 2 to 3 hours 75-85 Shore D -100°F to +350°F /it/tds/supreme-3ccm-85

Need Expert Guidance?

Our expert engineers offer one-on-one consultations to help you navigate our extensive material library and find the right solution for your application. We ensure confidentiality and quick turnaround (1-2 business days).